Water Treatment Works
Fleetwood
Date: | 2011 |
Value: | £210,000 |
Location: | Fleetwood |
Client: | KMI Plus |
Part of the United Utilities AMP initiative, we installed all of the gravity mains and pressurised pipework.
Our Projects
W&B have been involved with numerous schemes throughout United Utilities’ AMP 3 & 4 these projects were undertaken over a period of 10 years.
We have in depth experience of both water and wastewater treatments works to include pressurised systems and gravity mains.
Water Treatment Works
Date: | 2008 |
Value: | £1.2 Million |
Location: | Stocks Reservoir, Ribble Valley - Forest of Bowland |
Client: | KMI Plus |
Installation of pipe work for a new underground system; to be used in conjunction with the existing gravity mains from Stocks Reservoir.
Large diameter ductile iron flanged steel pipe work, valves & chambers were required to bring this scheme into operation.