W&B consider themselves highways drainage specialists and have been delivering complex schemes for a number of years. These would include A580 guided busway (Galliford Try), A6 Manchester Airport Relief Road (Morgan Sindall) & A534 Congleton Link Road (John Graham Construction) to name but a few.

Civil Engineering 27

Highways

South Heywood Link Road

Date:2021 - ongoing
Value:£1.75 Million
Location:Heywood, Rochdale, Greater Manchester
Client:John Sisk & Son Ltd

W&B are undertaking all associated ducting, culverts, drainage & kerbing for the construction of a brand new link road which will create a new access route at junction 19 of the M62 directly to the South Heywood.


Civil Engineering 45

Highways

A523 Poynton Relief Road

Date:2021 - ongoing
Value:£1.25 Million
Location:Poynton, Cheshire
Client:John Graham Construction

The programme involves the creation of a 3.5km long, two-way single carriageway road which will relieve the existing Poynton town traffic and improve connectivity between Macclesfield, Stockport, Manchester Airport and the wider area. W&B will be undertaking all drainage & pre-earthworks drainage.

A51 Tarvin 2

Highways

A51 Tarvin - Chester Improvement Scheme

Date:2021
Value:£100,00
Location:Chester
Client:D Morgan

Installing a new drainage system to facilitate carriageway improvement scheme 

A3 Congleton Road List Image

Highways

A536 Congleton Link Road

Date:2020 - 2021
Value:£1.5 Million
Location:Congleton, Cheshire
Client:John Graham Construction

This is an ongoing project where we are delivering on a 5.7-kilometre drainage scheme, including kerbing, on a bypass that will join the A534 Sandbach Road to A536 Macclesfield Road.

M1 A Cropped

Highways

M1, Junction 23 & A512 Improvement Scheme

Date:2020
Value:£100,000
Location:Shepshed, Leicestershire
Client:Morgan Sindall

Installing telecommunication ducting 

M6 Smart List Image

Highways

M62 Smart Motorway

Date:2019
Value:£2 Million
Location:Eccles, Manchester
Client:Morgan Sindall & BAM Nuttall (Joint Venture)

Upgrading and installation of new drainage, to include kerbs, along a 10-mile route between junction 10 and junction 12 on the M62 smart motorway. Due to traffic management restrictions night working was required to bring the project to completion.

A6 For Website

Highways

A6 Manchester Relief Road

Date:2017
Value:£6.8 Million
Location:Manchester & Cheshire
Client:Morgan Sindall

Combining new road construction with the existing infrastructure; we delivered a scheme of over 55,000 metres of drainage along a 10-kilometre stretch from the A6 at Stockport into the landing lights of Manchester Airport. We were also appointed to upgrade the drainage system on the existing A34.

A580

Highways

A580

Date:2014
Value:£1 Million
Location:Manchester
Client:Galliford Try

We delivered drainage as part of a scheme developed by Transport for Greater Manchester. Their objective was to create a new 250 space car park and ride site on the East Lancashire Road (A580) to encourage commuters to catch future busway services. W&B carried out all of the main carriageway drainage works including all kerbing & flagging.

Contact our Commercial Team

ACCREDITATIONS

DELIVERING QUALITY

SINCE 1987

We pride ourselves on safety, efficiency, transparency and competence
Chas accreditation logo Constructonline accreditation logo
Builder's Profile accreditation logo Smas Worksafe accreditation logo